Nate Traylor reports on Utah State University's 22,000 square foot Moab Academic Building by Lake Flato Architects with MHTN, which earned ILFI Zero Energy certification in March 2026 as the university's first net zero building. The piece walks through the passive moves first: an east west bar, deep south overhangs, honed concrete block for thermal mass, clerestories over the circulation spine and operable windows. Then the systems: ground source heat pumps under the parking lot and a photovoltaic array on four parking canopies, enlarged from 178 kW to 209 kW by a local grant. Testing before occupancy caught a unit missing its backup heating and a refrigerant leak.

Findings across Design, Arts & Culture, Sound, Collecting, Document & Film, gathered each morning. Picked up wherever they were left.
Subscribe by RSS